Measures to reduce the downtime of a transit wagon with processing
https://doi.org/10.46684/2687-1033.1.15
Abstract
The program for the development of marshalling yards until 2025 assumes the concentration of car traffic processing at large, technically well-equipped marshalling yards. Measures to reduce the downtime of transit cars with processing at the marshalling yard A, aimed at identifying and reducing costs when driving freight trains of increased weight and length on the section A–I1, are relevant from a practical point of view.
One way to reduce the cost of driving freight trains of increased weight and length is to avoid forming 9,000-ton trains. Station A forms trains of increased mass and length, measuring 8000 tons and 9000 tons. This technology has a certain positive effect — an increase in the average weight of the train by 25.5 tons, reducing the need for locomotives and locomotive crews, increasing the carrying capacity of the section, unloading the tracks of the receiving and sending fleet. Also, this technology entails a certain number of difficulties in operation, such as certain requirements for the equipment of locomotives and the use of only three-section locomotives for trains weighing 9,000 tons. This raises the question of the feasibility of driving trains weighing 9,000 tons.
About the Author
D. Yu. GrishkovaRussian Federation
Diana Yu. Grishkova — Candidate of Technical Sciences, Associate Professor, Associate Professor
191 Dusi Kovalchuk st., Novosibirsk, 630049
References
1. Sotnikov E. Operation within the polygon. Gudok. 2017; 191. URL: https://gudok.ru/newspaper/?ID=1391191&archive=2017.10.26 (In Russian).
2. Rakhimzhanov D.M. Large reserve for developing growing cargo traffic. Railway Transport. 2016; 4:4-7. (In Russian).
3. Grigoriev L.Yu. Management by notes: technology of building an effective companies. Moscow, Alpina publisher, 2010; 692. (In Russian).
4. Goldratt E.M., Cox J. The goal: A Process of continuous improvement. Goal-2: It’s not about luck. Moscow, Logos, 2005; 778. (In Russian).
5. Repin V., Eliferov V. Process approach to management. Business process modeling. Moscow, Mann, Ivanov and Ferber, 2013; 544. (In Russian).
6. Roter M., Shuk D. Learn to see business processes. Practice of building maps of value creation flows. Moscow, Alpina Business Books, 2005; 144. (In Russian).
7. Wumek JP., Jones D.T. Lean manufacturing: How to get rid of losses and achieve prosperity of your company / Trans. from English. Moscow, Alpina Business books, 2004; 473. (In Russian).
8. Kazarin V. Flow mapping. URL: http://www.leaninfo. ru/2010/06/21/kartirovanie-potok-zachem/ (In Russian).
9. George M. Lean manufacturing + six sigma in the service sector. Moscow, Alpina Business books, 2005; 402. (In Russian).
10. Vader M. Tools of lean manufacturing: A Mini-guide to implementing lean manufacturing techniques / trans. from english. 2nd ed. Moscow, Alpina Business books, 2006; 125. (In Russian).
11. Belyaeva T.V., Savchenko E.A., Severova M.O. Economics of the industry: A Workshop. Novosibirsk, Siberian State University of Railway Engineering, 2014; 37. (In Russian).
Review
For citations:
Grishkova D.Yu. Measures to reduce the downtime of a transit wagon with processing. Transport Technician: Education and Practice. 2020;1(1-2):88-93. (In Russ.) https://doi.org/10.46684/2687-1033.1.15